GB/T 18363-2017 PDF English (GB/T 18363-2001: Older version)


Search result: GB/T 18363-2017 (GB/T 18363-2001 Older version)
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 18363-2017150 Add to Cart Auto, < 3 mins Filling Receptacle of CNG Vehicle Valid
GB/T 18363-2001359 Add to Cart 3 days Filling receptacle of CNG vehicle Obsolete

Similar standards: QC/T 1164   QC/T 1163   GB/T 18364   GB/T 35348   

GB/T18363-2017 (GBT18363-2017): PDF in English

GB/T 18363-2017 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 43.060.40 T 13 Replacing GB/T 18363-2001 Filling Receptacle of CNG Vehicle ISSUED ON. OCTOBER 14, 2017 IMPLEMENTED ON. MAY 01, 2018 Issued by. General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of PRC. Table of Contents Foreword . 3 1 Scope .. 5 2 Normative References . 5 3 Terms and Definitions .. 5 4 Type and Model .. 6 5 Technical Requirements .. 6 6 Test Methods .. 8 7 Inspection Rules .. 11 8 Marking, Package, Transportation and Storage .. 13 9 Exit-Factory Documents . 14 Appendix A (Informative) Basic Structural Mode .. 15 Appendix B (Normative) The Nearest Distance from One-Way Valve to Inlet End of Receptacle . 16 Appendix C Receptacle Size .. 17 Foreword This Standard was drafted as per the rules specified in GB/T 1.1-2009. This Standard replaced GB/T 18363-2001 Filling Receptacle of CNG Vehicle. Compared with GB/T 18363-2001, this Standard has the major technical changes as follows. --- Modified “Scope”; --- Adjusted the Normative References. canceled the abolished CB 744 Quality Inspection of Metallic and Chemical Coatings, and SY 7546-1996 Compressed Natural Gas for Vehicle; added GB/T 19240 Mounting Requirements of Special Equipment for Compressed Natural Vehicles, GB 18047 Compressed Natural Gas as Vehicle Fuel, and CB/T 3764 Thickness Series and Quality Requirements for Metallic and Chemical Coatings; --- Modified “5.1.1” into “5.1.1 the quality and structure of filling receptacle shall conform to the relevant provisions of QC/T 245, manufactured according to the drawings and technical documents approved by the stipulated procedures”; --- Modified “5.2.2 airtightness” into “after the filling receptacle takes the airtightness test as per the test method stipulated in 6.4, its pressure-bearing parts and the sealing position of one-way valve shall have no leakage or the leakage rate shall be less than 20cm3/h (standard state). NOTE. the standard state indicates temperature of 20°C, air pressure of 101.325 kPa. Below is the same.”; --- Modified “6.8 compatibility test b)” into “b) compressor oil. synthetic compressor oil (heavy duty L-DAC, viscosity class of 150)”; --- Added “7.2 the inspection procedure shall perform the relevant item inspection as per the serial number order and item stipulated in Table 2; the number of test pieces for each item shall be no less than two pieces”. This Standard was proposed by Ministry of Industry and Information Technology. This Standard shall be under the jurisdiction of National Technical Committee for Standardization of Automobile (SAC/TC 114). Drafting organizations of this Standard. Chengdu Bus Co., Ltd., Beijing Lantianda Auto Clean Fuel Technology Co., Ltd., Liuzhou Wuling Automobile Industry Co., Ltd., Shanghai Xingdi Environmental Protection Equipment Co., Ltd., Chongqing Dinghui Automobile Fuel Gas System Co., Ltd., CECEP Chongqing Industry Co., Ltd., Xihua University, and China Automotive Technology & Research Center. Filling Receptacle of CNG Vehicle 1 Scope This Standard specifies the type and model, technical requirements, test methods, inspection rules, marking, package, transportation, storage and exit-factory documents of filling receptacle of CNG vehicle. This Standard is applicable to the filling receptacle of CNG vehicle using vehicle CNG that meets the requirements of GB 18047 as the working medium, with nominal working pressure of 20MPa (the pressure values in this Standard are all gauge pressure), with working temperature of -40°C~120°C. 2 Normative References The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this document. GB/T 10125 Corrosion Tests in Artificial Atmospheres - Salt Spray Tests GB 18047 Compressed Natural Gas as Vehicle Fuel CB/T 3764 Thickness Series and Quality Requirements for Metallic and Chemical Coatings QC/T 245 Technical Specifications for Isolated Plant of Compressed-Natural-Gas (CNG) Automobile 3 Terms and Definitions The following terms and definitions are applicable to this document. 3.1 Receptacle The part that connects the filling receptacle and filling gun. 3.2 Protective cap After the one-way valve completes 30000 times of continuous working cycles, 24h flutter and full flow impact test as per the test method stipulated in 6.6, it shall meet the requirements of 5.2.2. 5.2.5 Oxidative aging resistance After the non-metallic parts of the filling receptacle goes through the oxidative aging resistance test as per the test method stipulated in 6.7, it shall be free of deformation, cracks, deterioration, spots, and the like phenomena. 5.2.6 Compatibility After the non-metallic parts of the filling receptacle performs the compatibility test as per the test method stipulated in 6.8, it shall be free of cracks, breakage; the material’s volume expansion rate shall be ≤25%, the shrinkage rate shall be ≤1%, while the quality change shall be ≤10%. 5.2.7 Corrosion resistance 5.2.7.1 After the brass pressure-bearing parts with zinc content ≥15% performs the corrosion resistance test as per the test method stipulated in 6.9.1, use 25X magnifier to inspect, the components shall have no cracks. 5.2.7.2 After the filling receptacle finishes the salt spray test as per the test method stipulated in 6.9.2, it shall meet the requirements of 5.2.2. 6 Test Methods 6.1 General rules 6.1.1 Test conditions Unless otherwise is specified, the test shall be performed under the following conditions. a) The test environment temperature shall be 15°C~35°C; b) The test medium shall be clean dry air or nitrogen. 6.1.2 Requirements for test instrument Unless otherwise is specified, the test instrument shall meet the following requirements. a) Pressure meter. the accuracy is no less than Level-1.5; the measuring range is 1.5~3 times of the measuring value. slowly reduce to 0MPa; then stabilize the pressure for 3min at 22MPa, 0.5MPa, and 0.05MPa 6.5 Anti-impact load test of protective cap The protective cap is installed on the fixed receptacle; then the steel ball with diameter of 50mm, mass of 0.5kg drops from the height of 0.3m and impacts on the most vulnerable part of the protective cap. 6.6 Durability test of one-way valve Unless otherwise is specified, new test pieces shall be used for each of the following tests. a) 30000 times of working cycle test. The inlet end of the filling receptacle is connected to the high-pressure gas source; test pressure is increased from 0MPa to 22MPa; so that the one-way valve is in the opened state. Then the inlet end shall relieve the pressure to 0MPa; so that the one-way valve bears the 22MPa pressure and in the closed state; maintain for at least 2s; then the outlet end shall relieve the pressure to 0MPa. Repeat the cycle in such a method, so the one-way valve periodically opens and closes. The opening-closing cycle frequency shall be no greater than 15times/min. The total number of cycle tests is 30000 times. b) 24h flutter test Make the one-way valve reach the most severe flutter state through adjusting the flow rate of one-way valve, then maintain for 24h. c) Full flow impact test The starting pressure of the air supply on the inlet shall be 22MPa, the outlet flow is not limited, the duration for each impact is no less than 2s; the air supply pressure shall be no less than 16MPa when the impact is finished; then relieve the inlet pressure, so that the one-way valve shall be closed. Perform 30 times continuous impact tests. 6.7 Oxidative aging resistance test The non-metallic parts of the filling receptacle in contact with the natural gas shall be placed in the oxygen for 96h at a pressure of 2.0MPa, temperature of 70°C±2°C. 6.8 Compatibility test Immerse the non-metallic parts of the filling receptacle in contact with natural gas into the specified medium for 70h at the temperature of 23°C±2°C; when the medium is For the test pieces that are tested or inspected qualified, if the inspection items may influence its use performance or service life, then such test piece shall not be left the factory as the qualified product. 8 Marking, Package, Transportation and Storage 8.1 Marking The filling receptacle product shall have the following permanent markings. a) Model and specification of filling receptacle; b) Manufacturer’s name and logo; c) Production lot number and date. 8.2 Package 8.2.1 The product shall be clean and intact before packaging. 8.2.2 The package bags (or boxes) shall prevent the ingress of corrosive medium AND prevent the damage to the product during the transporting period. 8.2.3 The outer package shall have the following markings. a) Manufacturer name; b) Product model and number; c) Quantity and quality; d) Exit-factory date; e) Appearance dimension (L×W×H); f) Handling precautions. 8.2.4 The package shall be accompanied by product certificate, product instructions, and necessary packing list. 8.3 Transportation and Storage 8.3.1 The product shall be handled with care during the transporting process, prevent the heavy pressure and collision; strictly prohibit the rain and chemical corrosion. 8.3.2 The product shall be stored in the ventilated, dry and clean room. .......
Source: https://www.ChineseStandard.net/PDF.aspx/GBT18363-2017