TB 10001-2016 PDF English
US$460.00 · In stock · Download in 9 secondsTB 10001-2016: Code for design of railway earth structure Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid TB 10001: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
TB 10001-2016 | English | 460 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Code for design of railway earth structure
| Valid |
TB 10001-2005 | English | RFQ |
ASK
|
8 days
|
Code for design on subgrade of railway
| Obsolete |
TB 10001-1999 | English | RFQ |
ASK
|
9 days
|
Code for design on subgrade of railway
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: TB 10001-2016
TB 10001-2016: Code for design of railway earth structure---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/TB10001-2016
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
J 447-2017
Code for design of railway earth structure
Issued on. DECEMBER 20, 2016
Implemented on. APRIL 01, 2017
Issued by. State Railway Administration
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
Code for design of railway earth structure
J 447-2017
Main drafting organization. China Railway First Survey and Design
Institute Group Co., Ltd.
Approved by. State Railway Administration
Date of implementation. April 1, 2017
2017 Beijing
Table of Contents
Foreword... 8
1 General... 11
2 Terms and symbols... 12
3 Basic requirements... 17
4 Design load... 37
5 Engineering materials... 48
6 Subgrade bed... 62
7 Embankment... 68
8 Cutting... 73
9 Transition section... 75
10 Ground treatment... 82
11 Retaining structure... 86
12 Subgrade protection... 90
13 Water prevention and drainage of subgrade... 99
14 Reconstruction of railway subgrade for existing line and addition of second
line... 108
15 Borrow (spoil) area and earthwork allocation... 115
16 Subgrade interface design... 118
Appendix A Grouping classification of ordinary fillers... 121
Appendix B Design of improved soil and test requirements... 131
Appendix C Steel model, concrete grade and strength... 137
Appendix D Common ground treatment methods and measure application
conditions... 140
Appendix E Green protection for subgrade slopes... 142
Appendix F Diagrams for design of subgrade waterproof and drainage... 144
Explanation of wording in this code... 150
1 General
1.0.1 This code is formulated to unify the technical standards for railway
subgrade design, make the subgrade design meets the requirements of safety,
reliability, advanced technology, economic rationality.
1.0.2 This code is applicable to the design of standard gauge subgrades for
high-speed railways, intercity railways, passenger-freight level I and level II
railways, heavy-duty railways.
1.0.3 The subgrade project shall be designed according to the geotechnical
structure, to ensure that it meets the requirements of strength, stability and
durability; meets the relevant requirements of environmental protection, soil and
water conservation, cultural relic protection, etc.
1.0.4 The subgrade engineering shall, through geological mapping,
comprehensive exploration, testing and analysis, ascertain the geotechnical
structure and physical and mechanical properties of the subgrade base, cutting
slope, retaining structure foundation, etc., as well as the nature and distribution
of the filler. Perform design based on reliable geological data.
1.0.5 The subgrade engineering design should avoid high filling, deep
excavation, long cutting; avoid areas with adverse geological conditions. In the
comparison and selection of subgrade, bridge, tunnel engineering, it shall make
comprehensive analysis in terms of technical conditions, construction
conditions, land occupation, possible environmental and social impacts, urban
construction planning, construction investment, operation and maintenance
costs, to determine the type of project.
1.0.6 The railway train’s load shall be determined according to railway
transportation characteristics, mobile equipment, design speed, etc. High-
speed railway should adopt ZK load diagram. Intercity railway should adopt ZC
load diagram. Passenger-freight railways should adopt ZKH load diagram.
Heavy-load railway should use ZH load diagram. When the characteristics of
passenger-freight railway meet the standards of heavy-duty railways, it shall
use the ZH load diagram.
1.0.7 The design of subgrade engineering shall be based on railway grade,
subgrade structure, and other factors; according to local conditions, reasonably
select engineering materials. Meanwhile it shall meet the application conditions
and use requirements of subgrade engineering. Subgrade fillers shall be
surveyed and designed as engineering materials, to reasonably determine the
earthwork allocation plan.
1.0.8 Subgrade engineering’s design shall consider the transition between
subgrade and bridges, lateral structures, tunnels, and other subgrades of
different structures.
1.0.9 The foundation treatment measures for the subgrade project shall be
determined according to the railway grade, geological conditions,
environmental requirements, embankment height, filler, construction period, etc.
Meanwhile it shall meet the requirements of the stability of the subgrade and
post-construction settlement.
1.0.10 The subgrade’s retaining structure shall be designed according to the
geological conditions, track loads, train loads, whilst considering the effects of
natural factors such as atmospheric precipitation, groundwater, surrounding
environment.
1.0.11 The subgrade project shall have complete, systematic and unobstructed
drainage facilities, which shall be reasonably connected with railway bridges
and culverts, tunnels, stations and local drainage systems.
1.0.12 The structure of the catenary support foundation, sound barrier
foundation, cable trough, cross-rail pipeline, comprehensive grounding
provided on the roadbed shall be designed synchronously and constructed in a
coordinated manner with the subgrade engineering, to ensure the integrity and
stability of the subgrade.
1.0.13 Subgrade engineering shall promote the use of safe and reliable new
technologies, new structures, new materials, new processes.
1.0.14 The land used for subgrade shall comply with the national construction
land policy and relevant regulations, implement the principle of land
conservation; meet the requirements of stability of subgrade, drainage facilities
and protection fences.
1.0.15 In addition to this code, the design of railway subgrades shall also
comply with the relevant national standards.
2 Terms and symbols
2.1 Terms
2.1.1 Earth structure
A geotechnical structure directly supporting the track structure formed by
excavation or filling.
2.1.2 Embankment
Subgrade filled with soil and stone on the ground.
2.1.3 Cutting
Subgrade dug down from the ground surface.
2.1.4 Subgrade shoulder
The part at both sides of the formation surface which is not covered by the
ballast bed.
2.1.5 Elevation of subgrade shoulder
The elevation of the outer edge of the shoulder.
2.1.9 Transition section
The section at the joint between the subgrade and bridge abutments, lateral
structures, tunnels, embankments and cutting, which needs special treatment.
2.1.10 Post-construction settlement of subgrade
Settlement of the subgrade after the completion of the track laying project.
2.1.18 Chemically-improved soil
The mixed soil material whose raw earth material is mixed with lime, cement,
mineral admixture and other materials to change the chemical composition of
the filler to improve its engineering performance.
2.1.32 Side drain
Open ditch close to the outside of the shoulder of the cutting which is used to
drain the water from the formation surface and side slope.
3 Basic requirements
3.1 Elevation of subgrade shoulder
3.1.1 When the elevation of the shoulder is controlled by the flood level or tidal
level, the design flood level or tidal level shall be determined according to the
following requirements.
3.1.3 The height of the shoulder of the reservoir subgrade shall be greater than
the sum of the design water level, wave invasion height, backwater height
(including the backwater of the reservoir and the backwater on the shore), the
safe height.
3.2 Shape and width of formation surface
3.2.1 The shape of the formation surface shall meet the following requirements.
3.2.3 The width of the formation surface between sections be calculated and
determined according to factors such as design speed, track type, number of
main lines, line spacing, curve widening, shoulder width, road maintenance
form, cable trough, catenary pillar type, foundation type, etc. Consider the
setting of the sound barrier foundation if necessary.
3.2.5 The standard formation surface’s width of the straight section of the
passenger-freight shared line electrified railway shall be calculated and
determined according to formula (3.2.5) and Figure 3.2.5.
3.3 Subgrade stability and settlement control criteria
3.3.1 The slope stability shall be analyzed by suitable calculation methods such
as arc sliding method, plane sliding method or broken line sliding method
according to the slope type and possible failure forms. When the slope failure
mechanism is complicated, it should be analyzed in combination with numerical
analysis method.
4 Design load
4.1 General provisions
4.1.1 The load on the railway subgrade structure can be classified according to
Table 4.1.1 according to the time of action and the frequency of occurrence.
4.1.2 The design of subgrade engineering shall, according to the functional
requirements of the structure and the design conditions of use, use the
corresponding combinations. The design and verification use different safety
factors.
4.1.3 When the subgrade engineering is designed with the total safety factor
method, the load and action shall use the calculated values; the load
combinations shall comply with the requirements in Table 4.1.3.When using the
limit state method for design, the load and action shall use the design value;
the load combination shall meet the relevant requirements.
4.2.3 The calculation of the unit load and the dynamic load of the train on the
passenger-freight shared railway shall meet the following requirements.
4.2.7 For the subgrade structure as affected by the dynamic stress, it shall
consider the dynamic load of train during design.
4.3.3 When the retaining structure is used as a wave barrier structure, the wave
pressure acting on the retaining structure shall be, based on the wind direction
in front of the wall, the wind speed, the length of the wind zone (stroke), the
average water depth in the wind zone, the actual wave form in front of the wall,
etc., determined through calculation in accordance with the relevant standards.
4.4 Special forces
4.4.1 The subgrade structure under seismic conditions shall consider seismic
forces. The calculation method of seismic force on rigid structures and soil
rupture prisms may adopt static method.
4.4.2 The subgrade structure check and calculation shall consider temporary
loads such as rack transport equipment and its load capacity.
5 Engineering materials
5.1 General provisions
5.1.1 The filler, stone, concrete, cement mortar, steel, geosynthetic materials
used in the subgrade project shall be determined according to its type,
characteristics, performance, scope of application, type of application structure,
application environment.
5.2 Filler
5.2.1 Subgrade fillers shall be subject to geological mapping, exploration, test
work to ascertain the geotechnical properties, distribution, reserves of the
source material, meanwhile determine the source, classification, group name,
deployment plan, improvement measures of the filler.
5.2.2 Subgrade fillers can be divided into ordinary fillers, physically improved
soils, chemically improved soils, graded macadams according to the method of
use or processing of the original soil material.
to engineering performance and grading characteristics. For the classification
of ordinary filler groups, see Appendix A.
5.2.5 The classification of ordinary fillers shall meet the following requirements.
6 Subgrade bed
6.1 General provisions
6.1.1 The structure of the subgrade bed shall meet the requirements of strength
and deformation, to ensure its long-term stability under the influence of train
loads, precipitation, dry and wet cycles, freeze-thaw cycles.
6.2 Subgrade bed structure
6.2.1 The subgrade bed structure shall be composed of the surface layer of the
subgrade bed and the bottom layer of the subgrade bed. Its structural design
shall meet the following requirements under the load of the train.
6.3 Embankment subgrade bed
6.3.1 The filler of the surface of the subgrade bed shall be determined according
to the railway grade, design speed, track type, etc. according to Table 6.3.1.
6.3.3 For low embankments with a height of less than 2.5 m, the bearing
capacity, soil quality, natural compactness of the natural foundation within the
range of the bottom of the subgrade bed shall comply with the provisions of
clauses 6.1.2, 6.3.2, 6.5.3 of this code.
6.4 Subgrade bed for cutting
6.4.1 For the hard rock subgrade bed which is not easily weathered, the
formation surface shall be provided with not less than 4% herringbone drainage
slope.
6.5 Compaction criteria of subgrade bed
6.5.1 The compaction control index of the subgrade bed’s filler shall meet the
following requirements.
6.6.3 When the subgrade bed is affected by groundwater, it should take
measures such as lowering the groundwater level and setting up embankment-
type cutting, to reduce and empty the water in the area of the subgrade bed.
6.6.4 For the semi-filled and semi-cut subgrade bed on steep slope section, the
range not less than 1 m below the subgrade bed at the semi-cut side shall be
cut and filled; the filler shall meet the requirements of clauses 6.3.1 and 6.3.2
of this code.
7 Embankment
7.1 General provisions
7.1.1 The height of the embankment slope shall be reasonably determined in
combination with railway grade, track type, foundation conditions, source of filler,
land use nature, environmental factors, which should not exceed 20 m.
7.1.2 The surface treatment of the subgrade of the embankment on stable slope
section shall meet the following requirements.
7.1.4 When groundwater in the base affects the stability of the embankment, it
shall take measures such as interception and drainage beyond the base area
or filling of seepage filler at the bottom of the embankment, which shall not
deteriorate the base conditions.
7.1.5 When the stability of the embankment on soft soil and other types of thick
soft soil foundation and the post-construction settlement do not meet the
requirements, it shall perform foundation treatment, which shall be coordinated
with the base treatment.
7.2 Filler and filling requirements
7.2.4 The maximum particle size of the filler below the embankment’s subgrade
bed shall meet the following requirements.
7.3 Compaction criteria
7.3.1 The compaction control index of the embankment’s filler below the
subgrade bed shall meet the following requirements.
8 Cutting
8.1 General provisions
8.1.1 The height of the cutting slope shall b1 For fine-grained soil, sandy soil, gravelly soil, macadam soil, block stone
soil, etc., it shall use the compaction coefficient and foundation
deformation coefficient as control indicators.
8.1.2 Soil, soft rock and strongly weathered hard rock cuttings shall be provided
with side drain platforms, the width of which shall not be less than 0.5 m; cutting
slopes shall be provided with slope platforms at the interface between soil and
rock boundaries, permeable and impermeable layers; the width should not be
less than 2 m.
8.3 Rock cutting
8.3.1 The slope form and slope rate of rock cutting shall be determined
according to the engineering geology, hydrogeology and meteorological
conditions, lithology, slope height, construction method, combined with rock
mass structure, structural surface appearance, weathering degree, natural
stable slope, survey of artificial slopes, be comprehensively determined. It may
use the stability analysis methods to check it if necessary.
8.3.3 Platforms and drainage facilities for strongly weathered or fully weathered
hard rock and soft rock cuttings may be provided in accordance with clause
8.1.2 of this code.
8.3.4 When the height of the rock cutting slope is greater than 20 m, the slope
rate and form shall be determined through calculation of stability analysis; the
minimum stability safety factor shall meet the requirements of clause 3.3.5 of
this code.
9 Transition section
9.1 General provision
9.1.1 When subgrades and bridges and tunnels as well as other offline
structures, different subgrade structures, different types of ground treatment
may cause the foundation settlement deformation and rigid difference of the
track, it shall set a transition section.
9.1.4 For the semi-filled and semi-cut subgrade across the excavation and filling
under the track, the rigid difference with the filling part may be adjusted by
changing the replacement filling excavation part. The thickness of the
replacement fill should be determined according to the foundation conditions
and the height of the filling part.
9.1.5 For the transition section set on the back of the abutment and on both
sides of the lateral structure, when hard rock needs to be excavated, it should
be subject to special design in combination with railway grade and excavation
height; it may take the backfill concrete measures to treat it.
9.2 Transition section between subgrade and abutment
9.2.2 The length of the transition section shall be determined according to
formula (9.2.2). The length of the transition section of high-speed railways and
ballast-less track railways shall not be less than 20 m.
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
J 447-2017
Code for design of railway earth structure
Issued on. DECEMBER 20, 2016
Implemented on. APRIL 01, 2017
Issued by. State Railway Administration
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
Code for design of railway earth structure
J 447-2017
Main drafting organization. China Railway First Survey and Design
Institute Group Co., Ltd.
Approved by. State Railway Administration
Date of implementation. April 1, 2017
2017 Beijing
Table of Contents
Foreword... 8
1 General... 11
2 Terms and symbols... 12
3 Basic requirements... 17
4 Design load... 37
5 Engineering materials... 48
6 Subgrade bed... 62
7 Embankment... 68
8 Cutting... 73
9 Transition section... 75
10 Ground treatment... 82
11 Retaining structure... 86
12 Subgrade protection... 90
13 Water prevention and drainage of subgrade... 99
14 Reconstruction of railway subgrade for existing line and addition of second
line... 108
15 Borrow (spoil) area and earthwork allocation... 115
16 Subgrade interface design... 118
Appendix A Grouping classification of ordinary fillers... 121
Appendix B Design of improved soil and test requirements... 131
Appendix C Steel model, concrete grade and strength... 137
Appendix D Common ground treatment methods and measure application
conditions... 140
Appendix E Green protection for subgrade slopes... 142
Appendix F Diagrams for design of subgrade waterproof and drainage... 144
Explanation of wording in this code... 150
1 General
1.0.1 This code is formulated to unify the technical standards for railway
subgrade design, make the subgrade design meets the requirements of safety,
reliability, advanced technology, economic rationality.
1.0.2 This code is applicable to the design of standard gauge subgrades for
high-speed railways, intercity railways, passenger-freight level I and level II
railways, heavy-duty railways.
1.0.3 The subgrade project shall be designed according to the geotechnical
structure, to ensure that it meets the requirements of strength, stability and
durability; meets the relevant requirements of environmental protection, soil and
water conservation, cultural relic protection, etc.
1.0.4 The subgrade engineering shall, through geological mapping,
comprehensive exploration, testing and analysis, ascertain the geotechnical
structure and physical and mechanical properties of the subgrade base, cutting
slope, retaining structure foundation, etc., as well as the nature and distribution
of the filler. Perform design based on reliable geological data.
1.0.5 The subgrade engineering design should avoid high filling, deep
excavation, long cutting; avoid areas with adverse geological conditions. In the
comparison and selection of subgrade, bridge, tunnel engineering, it shall make
comprehensive analysis in terms of technical conditions, construction
conditions, land occupation, possible environmental and social impacts, urban
construction planning, construction investment, operation and maintenance
costs, to determine the type of project.
1.0.6 The railway train’s load shall be determined according to railway
transportation characteristics, mobile equipment, design speed, etc. High-
speed railway should adopt ZK load diagram. Intercity railway should adopt ZC
load diagram. Passenger-freight railways should adopt ZKH load diagram.
Heavy-load railway should use ZH load diagram. When the characteristics of
passenger-freight railway meet the standards of heavy-duty railways, it shall
use the ZH load diagram.
1.0.7 The design of subgrade engineering shall be based on railway grade,
subgrade structure, and other factors; according to local conditions, reasonably
select engineering materials. Meanwhile it shall meet the application conditions
and use requirements of subgrade engineering. Subgrade fillers shall be
surveyed and designed as engineering materials, to reasonably determine the
earthwork allocation plan.
1.0.8 Subgrade engineering’s design shall consider the transition between
subgrade and bridges, lateral structures, tunnels, and other subgrades of
different structures.
1.0.9 The foundation treatment measures for the subgrade project shall be
determined according to the railway grade, geological conditions,
environmental requirements, embankment height, filler, construction period, etc.
Meanwhile it shall meet the requirements of the stability of the subgrade and
post-construction settlement.
1.0.10 The subgrade’s retaining structure shall be designed according to the
geological conditions, track loads, train loads, whilst considering the effects of
natural factors such as atmospheric precipitation, groundwater, surrounding
environment.
1.0.11 The subgrade project shall have complete, systematic and unobstructed
drainage facilities, which shall be reasonably connected with railway bridges
and culverts, tunnels, stations and local drainage systems.
1.0.12 The structure of the catenary support foundation, sound barrier
foundation, cable trough, cross-rail pipeline, comprehensive grounding
provided on the roadbed shall be designed synchronously and constructed in a
coordinated manner with the subgrade engineering, to ensure the integrity and
stability of the subgrade.
1.0.13 Subgrade engineering shall promote the use of safe and reliable new
technologies, new structures, new materials, new processes.
1.0.14 The land used for subgrade shall comply with the national construction
land policy and relevant regulations, implement the principle of land
conservation; meet the requirements of stability of subgrade, drainage facilities
and protection fences.
1.0.15 In addition to this code, the design of railway subgrades shall also
comply with the relevant national standards.
2 Terms and symbols
2.1 Terms
2.1.1 Earth structure
A geotechnical structure directly supporting the track structure formed by
excavation or filling.
2.1.2 Embankment
Subgrade filled with soil and stone on the ground.
2.1.3 Cutting
Subgrade dug down from the ground surface.
2.1.4 Subgrade shoulder
The part at both sides of the formation surface which is not covered by the
ballast bed.
2.1.5 Elevation of subgrade shoulder
The elevation of the outer edge of the shoulder.
2.1.9 Transition section
The section at the joint between the subgrade and bridge abutments, lateral
structures, tunnels, embankments and cutting, which needs special treatment.
2.1.10 Post-construction settlement of subgrade
Settlement of the subgrade after the completion of the track laying project.
2.1.18 Chemically-improved soil
The mixed soil material whose raw earth material is mixed with lime, cement,
mineral admixture and other materials to change the chemical composition of
the filler to improve its engineering performance.
2.1.32 Side drain
Open ditch close to the outside of the shoulder of the cutting which is used to
drain the water from the formation surface and side slope.
3 Basic requirements
3.1 Elevation of subgrade shoulder
3.1.1 When the elevation of the shoulder is controlled by the flood level or tidal
level, the design flood level or tidal level shall be determined according to the
following requirements.
3.1.3 The height of the shoulder of the reservoir subgrade shall be greater than
the sum of the design water level, wave invasion height, backwater height
(including the backwater of the reservoir and the backwater on the shore), the
safe height.
3.2 Shape and width of formation surface
3.2.1 The shape of the formation surface shall meet the following requirements.
3.2.3 The width of the formation surface between sections be calculated and
determined according to factors such as design speed, track type, number of
main lines, line spacing, curve widening, shoulder width, road maintenance
form, cable trough, catenary pillar type, foundation type, etc. Consider the
setting of the sound barrier foundation if necessary.
3.2.5 The standard formation surface’s width of the straight section of the
passenger-freight shared line electrified railway shall be calculated and
determined according to formula (3.2.5) and Figure 3.2.5.
3.3 Subgrade stability and settlement control criteria
3.3.1 The slope stability shall be analyzed by suitable calculation methods such
as arc sliding method, plane sliding method or broken line sliding method
according to the slope type and possible failure forms. When the slope failure
mechanism is complicated, it should be analyzed in combination with numerical
analysis method.
4 Design load
4.1 General provisions
4.1.1 The load on the railway subgrade structure can be classified according to
Table 4.1.1 according to the time of action and the frequency of occurrence.
4.1.2 The design of subgrade engineering shall, according to the functional
requirements of the structure and the design conditions of use, use the
corresponding combinations. The design and verification use different safety
factors.
4.1.3 When the subgrade engineering is designed with the total safety factor
method, the load and action shall use the calculated values; the load
combinations shall comply with the requirements in Table 4.1.3.When using the
limit state method for design, the load and action shall use the design value;
the load combination shall meet the relevant requirements.
4.2.3 The calculation of the unit load and the dynamic load of the train on the
passenger-freight shared railway shall meet the following requirements.
4.2.7 For the subgrade structure as affected by the dynamic stress, it shall
consider the dynamic load of train during design.
4.3.3 When the retaining structure is used as a wave barrier structure, the wave
pressure acting on the retaining structure shall be, based on the wind direction
in front of the wall, the wind speed, the length of the wind zone (stroke), the
average water depth in the wind zone, the actual wave form in front of the wall,
etc., determined through calculation in accordance with the relevant standards.
4.4 Special forces
4.4.1 The subgrade structure under seismic conditions shall consider seismic
forces. The calculation method of seismic force on rigid structures and soil
rupture prisms may adopt static method.
4.4.2 The subgrade structure check and calculation shall consider temporary
loads such as rack transport equipment and its load capacity.
5 Engineering materials
5.1 General provisions
5.1.1 The filler, stone, concrete, cement mortar, steel, geosynthetic materials
used in the subgrade project shall be determined according to its type,
characteristics, performance, scope of application, type of application structure,
application environment.
5.2 Filler
5.2.1 Subgrade fillers shall be subject to geological mapping, exploration, test
work to ascertain the geotechnical properties, distribution, reserves of the
source material, meanwhile determine the source, classification, group name,
deployment plan, improvement measures of the filler.
5.2.2 Subgrade fillers can be divided into ordinary fillers, physically improved
soils, chemically improved soils, graded macadams according to the method of
use or processing of the original soil material.
to engineering performance and grading characteristics. For the classification
of ordinary filler groups, see Appendix A.
5.2.5 The classification of ordinary fillers shall meet the following requirements.
6 Subgrade bed
6.1 General provisions
6.1.1 The structure of the subgrade bed shall meet the requirements of strength
and deformation, to ensure its long-term stability under the influence of train
loads, precipitation, dry and wet cycles, freeze-thaw cycles.
6.2 Subgrade bed structure
6.2.1 The subgrade bed structure shall be composed of the surface layer of the
subgrade bed and the bottom layer of the subgrade bed. Its structural design
shall meet the following requirements under the load of the train.
6.3 Embankment subgrade bed
6.3.1 The filler of the surface of the subgrade bed shall be determined according
to the railway grade, design speed, track type, etc. accordi...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of TB 10001-2016 be delivered?Answer: The full copy PDF of English version of TB 10001-2016 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of TB 10001-2016_English with my colleagues?Answer: Yes. The purchased PDF of TB 10001-2016_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- TB 10001-2016 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version TB 10001-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version TB 10001-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of TB 10001-2016?A step-by-step guide to download PDF of TB 10001-2016_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "TB 10001-2016". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|