HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 14685-2022 PDF English

US$500.00 · In stock · Download in 9 seconds
GB/T 14685-2022: Pebble and crushed stone for construction
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 14685: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 14685-2022English500 Add to Cart 0-9 seconds. Auto-delivery Pebble and crushed stone for construction Valid
GB/T 14685-2011English140 Add to Cart 0-9 seconds. Auto-delivery Pebble and crushed stone for construction Obsolete
GB/T 14685-2001EnglishRFQ ASK 6 days Pebble and crushed stone for building Obsolete
GB/T 14685-1993EnglishRFQ ASK 3 days Pebble and crushed stone for building Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 14685-2022
      

Similar standards

GB/T 14684   GB/T 31387   GB/T 14902   GB/T 28627   

GB/T 14685-2022: Pebble and crushed stone for construction

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT14685-2022
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 91.100.15 CCS Q 13 Replacing GB/T 14685-2011 Pebble and crushed stone for construction Issued on. APRIL 15, 2022 Implemented on. NOVEMBER 01, 2022 Issued by. State Administration for Market Regulation. Standardization Administration of PRC.

Table of Contents

Foreword... 3 1 Scope... 6 2 Normative references... 6 3 Terms and definitions... 6 4 Classifications and categories... 8 5 General requirements... 8 6 Technical requirements... 8 7 Test methods... 11 8 Inspection rules... 48 9 Marking, storage, transportation... 49

1 Scope

This document stipulates the classification and categories, general requirements, technical requirements, test methods, inspection rules, marking, storage, transportation of pebbles and crushed stone used for construction. This document applies to pebbles and crushed stone, which are used in cement concrete and its products in construction projects (except hydraulic buildings).

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, for dated reference documents, only the version corresponding to the date applies to this document; for undated reference documents, the latest version (including all amendments) applies to this document. GB 175 Common Portland cement GB/T 2419 Test method for fluidity of cement mortar GB/T 6003.1 Test sieves - Technical requirements and testing - Part 1.Test sieves of metal wire cloth GB/T 6003.2 Test sieves - Technical requirements and testing - Part 2.Test sieves of perforated metal plate GB 6566 Limits of radionuclides in building materials GB 8076-2008 Concrete admixtures GB/T 14684-2022 Sand for construction GB/T 17671 Test method of cement mortar strength (ISO method) SL/T 352-2020 Test code for hydraulic concrete

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Pebble Under the action of natural conditions, rocks undergo crushing, weathering, sorting, migration, accumulation (sedimentation), forming rock particles which have a particle size greater than 4.75 mm. 3.2 Crushed stone Rock particles, which have a particle size greater than 4.75 mm, as produced from natural rocks, pebbles or mining waste rocks, through mechanical processing such as crushing and screening. 3.4 Irregular particle The particles of pebbles and crushed stone whose smallest one-dimensional size is less than 0.5 times the average particle diameter of the particle level to which the particle belongs. 3.5 Clay content in pebble The content of clay particles in pebbles, which have a particle size less than 75 μm. 3.6 Clay content and fine content in crushed stone The content of clay and stone powder particles in the crushed stone, which have a particle size less than 75 μm.

4 Classifications and categories

4.1 Classification Stones used for construction are divided into two categories. pebbles and crushed stone. 4.2 Category Stones for construction are classified according to clay content in pebble (clay content and fine content in crushed stone), clay lumps and friable particles content, elongated and flaky particle content, irregular particle content, sulfide and sulfate content, soundness,

5 General requirements

In addition to complying with the provisions of 6.4, harmful substances in crushed stone produced from mining waste rock shall also comply with the requirements of China's environmental protection and safety-related standards and specifications.

6 Technical requirements

6.1 Particle gradation The particle gradation of pebbles and crushed stone shall comply with the requirements in Table 1. 6.2 Clay content in pebble, clay content and fine content in crushed stone, clay lumps and friable particles content The clay content in pebble, clay content and fine content in crushed stone, clay lumps and friable particles content shall comply with the requirements in Table 2. 6.3 Elongated and flaky particle content and irregular particle content 6.3.1 Elongated and flaky particle content The elongated and flaky particle content of pebbles and crushed stone shall comply with the requirements in Table 3. 6.3.2 Irregular particle content The irregular particle content of category I pebbles and crushed stone shall not exceed 10%. 6.4 Hazardous substances The harmful substance content of pebbles and crushed stone shall comply with the provisions of Table 4. 6.5 Soundness When using the sodium sulfate solution method for testing, the mass loss of pebbles and crushed stone shall comply with the requirements in Table 5. 6.6 Strength 6.7 Apparent density, continuous graded loose packing void ratio The apparent density of pebbles and crushed stone and the void ratio of continuously graded loose stacks shall comply with the following requirements. 6.8 Water absorption rate The water absorption rate of pebbles and crushed stone shall comply with the requirements in Table 9. 6.9 Radioactivity The radioactivity of pebbles and crushed stone shall comply with the requirements of GB 6566. 6.10 Alkali-aggregate reaction When the purchaser makes a request, the measured expansion rate and alkali activity evaluation results shall be provided. 6.11 Moisture content and bulk density When the purchaser makes a request, the actual measured value shall be provided.

7 Test methods

7.1 Specimen 7.2 Test environment and test sieve 7.3 Particle gradation 7.3.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.3.2 Test procedures 7.3.3 Result calculation and evaluation 7.4 Clay content in pebble and clay content and fine content in crushed stone 7.5 Clay lumps and friable particles content 7.5.3 Result calculation and evaluation 7.6 Elongated or flaky particle content 7.6.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.6.2 Test procedures 7.6.3 Result calculation and evaluation The content of elongated or flaky particles shall be calculated according to formula (3), accurate to 1%. 7.7 Irregular particle content 7.7.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.7.2 Test procedures 7.7.3 Result calculation and evaluation 7.8 Organic matter content 7.8.1 Reagents and materials Reagents and materials shall comply with the following requirements. 7.8.2 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.8.3 Test procedures 7.8.4 Result evaluation 7.9 Sulfide and sulfate content (based on SO3 mass) 7.10 Soundness 7.10.1 Reagents and materials Reagents and materials shall comply with the following requirements. 7.10.2 Instruments and equipment Instruments and equipment shall comply with the following requirements. 7.10.3 Test procedures 7.10.4 Result calculation and evaluation 7.11 Rock compressive strength 7.12 Crush Indicator 7.12.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.12.2 Test procedures 7.12.3 Result calculation and evaluation 7.13 Apparent density 7.13.1 Liquid specific gravity balance method 7.13.2 Jar method 7.14 Packing density and void ratio 7.14.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.14.2 Test procedures 7.14.3 Result calculation and evaluation 7.14.4 Calibration method of volumetric cylinder Fill the volumetric cylinder with drinking water, at a temperature of 15 °C ~ 25 °C. Use a glass plate to push it along the opening of the cylinder, to make it close to the water surface. Wipe the outer wall of the cylinder dry. Then weigh its mass. The volume of the volumetric cylinder is calculated according to formula (17), accurate to 1 mL. 7.15 Water absorption 7.15.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.15.2 Test procedures 7.15.3 Result calculation and evaluation 7.16 Radioactivity It is carried out, according to the provisions of GB 6566. 7.17 Alkali-aggregate reaction 7.18 Moisture content 7.18.1 Instruments and equipment Instruments and equipment shall meet the following requirements. 7.18.2 Test procedures 7.18.3 Result calculation

8 Inspection rules

8.1 Inspection 8.1.1 Exit-factory inspection The exit-factory inspection items of pebbles and crushed stone shall be. loose packing density, particle gradation, clay content in pebble (clay content and fine content in crushed stone), clay lumps and friable particles content, elongated or flaky particle content, irregular particle content (category I). 8.1.2 Type inspection Type inspection shall be carried out under any of the following circumstances. 8.2 Group-batching rules Group batches according to the same classification, category, nominal particle size, daily output. If the daily output does not exceed 4000 t, every 2000 t forms a batch; if it is less than 2000 t, it is also a batch. 8.3 Determination rules 8.3.1 When the test results are all in compliance with the provisions of 6.1 ~ 6.9 of this document, the batch of products can be judged to be qualified. 8.3.2 When a test result does not meet the requirements of 6.1 ~ 6.9, it shall double the sample from the same batch of products, to carry out reinspection of this item. After re- inspection, if the test results meet the requirements, the batch of products can be judged to be qualified; if they still do not meet the requirements of 6.1 ~ 6.9, they will be judged to be unqualified. When two or more test results are inconsistent, the batch of products will be deemed unqualified.

9 Marking, storage, transportation

9.1 When pebbles and crushed stone leave the factory, both the supplier and the buyer shall inspect and accept the products in the factory. The manufacturer shall provide a product quality certificate, which includes. 9.2 Pebbles and crushed stone shall be stacked and transported separately, according to classification, category, nominal particle size, to prevent artificial crushing and product contamination. 9.3 During transportation, measures shall be taken to prevent spillage to avoid environmental pollution. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 14685-2022 be delivered?

Answer: The full copy PDF of English version of GB/T 14685-2022 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 14685-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 14685-2022_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 14685-2022 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 14685-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14685-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 14685-2022?

A step-by-step guide to download PDF of GB/T 14685-2022_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 14685-2022".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9