HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 10595-2017 PDF English

US$405.00 · In stock · Download in 9 seconds
GB/T 10595-2017: Belt conveyors
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 10595: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 10595-2017English405 Add to Cart 0-9 seconds. Auto-delivery Belt conveyors Valid
GB/T 10595-2009English95 Add to Cart 0-9 seconds. Auto-delivery Belt conveyors Obsolete
GB/T 10595-1989English719 Add to Cart 5 days General specification for belt conveyors Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 10595-2017
      

Similar standards

JB/T 7679   GB 14784   GB/T 10051.2   GB/T 44521   

GB/T 10595-2017: Belt conveyors

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT10595-2017
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 53.040.10 J 81 Replacing GB/T 10595-2009 Belt Conveyors Issued on. DECEMBER 29, 2017 Implemented on. JULY 1, 2018 Issued by. General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 7 2 Normative References... 7 3 Type and Basic Parameters... 10 4 Technical Requirements... 15 5 Test Methods... 25 6 Inspection Rules... 37 7 Marking, Packaging and Storage... 38 Appendix A (normative) Flaw Detection Method for Pulley... 41

1 Scope

This Standard specifies the type and basic parameters, technical requirements, test methods, inspection rules, marking, packaging and storage of belt conveyors (hereinafter referred to as the conveyors). This Standard is applicable to conveyors conveying bulk materials and finished articles. For conveyors conveying toxic, harmful, flammable, explosive, highly corrosive and radioactive materials, and conveyors with special requirements and types, the general parts may also be taken as a reference.

2 Normative References

The following documents are indispensable to the application of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB/T 191 Packaging - Pictorial Marking for Handling of Goods (GB/T 191-2008, ISO 780.1997, MOD) GB/T 226 Test Method for Macrostructure and Defect of Steel by Etching GB/T 700 Carbon Structural Steels GB/T 985.1 Recommended Joint Preparation for Gas Welding, Manual Metal Arc Welding, Gas-shield Arc Welding and Beam Welding GB/T 985.2 Recommended Joint Preparation for Submerged Arc Welding GB/T 1184 Geometrical Tolerancing - Geometrical Tolerance for Features without Individual Tolerance Indications (GB/T 1184-1996, eqv ISO 2768-2.1989) GB/T 1979 Standard Diagrams for Macrostructure and Defect of Structural Steels GB/T 2828.1 Sampling Procedures for Inspection by Attributes - Part 1.Sampling Schemes Indexed by Acceptance Quality Limit (AQL) for Lot-by-lot Inspection GB/T 3323 Radiographic Examination of Fusion Welded Joints in Metallic Materials GB/T 3767 Acoustics - Determination of Sound Power Levels and Sound Energy Levels of Noise Sources Using Sound Pressure - Engineering Methods for an Essentially Free Field over a Reflecting Plane (GB/T 3767-2016, ISO 3744.2010, IDT) GB/T 4053 Safety Requirements for Fixed Steel Ladders and Platform GB/T 4323 Pin Coupling with Elastic Sleeve GB/T 4490 Conveyor Belts with Textile Carcass - Widths and Lengths GB/T 5014 Pin Coupling Elastomer GB/T 5015 Gear Coupling with Pin Elastomer GB/T 5272 Coupling with Elastic Spider GB/T 6069 Roller Chain Coupling GB/T 6402 Steel Forgings - Method for Ultrasonic Testing GB/T 7233.1-2009 Steel Castings - Ultrasonic Examination - Part 1.Steel Castings for General Purposes

3 Type and Basic Parameters

3.1 Type A typical structure of the conveyors is shown in Figure 1. 3.2 Basic Parameters 3.2.1 Belt breadth The belt breadth of the conveyors shall preferably adopt the numerical values specified in Table 1. 3.2.2 Nominal belt speed The nominal belt speed of the conveyors shall preferably adopt the numerical values specified in Table 2. 3.2.3 Pulley 3.2.4 Idler roller

4 Technical Requirements

4.1 Conditions of Operating Environment 4.1.1 The temperature of the operating environment of the conveyors is 25 C ~ + 40 C. 4.1.2 The operating altitude of the conveyors shall not exceed 1,000 m. NOTE. when exceeding the above specified range, it shall be resolved through negotiation between the user and the manufacturer. 4.2 Whole-machine Performance 4.3 Drive Device 4.4 Steel Castings for the Conveyors 4.5 Steel Forgings for the Conveyors 4.6 Pulley 4.6.1 The minimum wall thickness b1 of the pulley body shall comply with the stipulations of 4.6.3 The quality classification limit of the defects of the pulley body and the welding seam of the plate shall comply with the requirements of Level-B in GB/T 19418.When ultrasonic testing is adopted, the inspection level shall not be lower than Level-B in GB/T 11345; the acceptance inspection level shall comply with the requirements of Level-2 in GB/T 29712.Alternatively, when radiographic inspection is adopted, its quality level shall not be lower than the requirements of Level-2 in GB/T 3323. 4.6.4 The internal stress of the pulley body with the resultant force greater than 80 kN shall be eliminated. 4.6.5 The diameter deviation of the outer circle of the pulley shall comply with the stipulations of Table 8. 4.6.6 When the pulley is a rubber surface pulley, its rubber layer shall be firmly bonded to the surface of the pulley, and there shall be no defects like delamination or foaming. The physical and mechanical properties of the top rubber shall comply with the stipulations of Table 9.The physical and mechanical properties of the primer shall comply with the stipulations of Table 10. 4.6.7 The non-destructive testing quality of the pulley shaft shall comply with the requirements of quality level 3 of straight probes in GB/T 6402.In addition, it shall also comply with the following conditions. 4.7 Idler Roller 4.7.1 The steel pipes for the idler roller shall not be lower than the requirements of GB/T 13793. 4.7.2 During the assembly of the idler roller, the bearing and sealing ring (labyrinth seal) shall be filled with No.2 lithium-based lubricating grease whose performance is not lower than what is specified in GB/T 7324.The grease filling amount of the bearing is 40% ~ 60% of the bearing clearance; in a seriously polluted environment, the grease filling amount shall reach 75% ~ 80%; the space between the sealing rings shall be full. 4.7.3 The radial circular runout of the outer circle of the idler roller shall comply with the stipulations of Table 13. 4.7.4 After the idler is assembled, under the effect of 500 N axial pressure, the axial displacement of the roller shall not exceed 0.7 mm. 4.8 Conveyor Belt 4.8.1 The sizes of the conveyor belt shall comply with the stipulations of GB/T 4490. 4.8.2 In accordance with the service conditions, the selected conveyor belt shall comply with the stipulations of the relevant standards, such as. GB/T 7984 and GB/T 9770, etc. 4.8.3 The vulcanized joints of the conveyor belt shall comply with GB/T 7984, GB/T 9770 and the relevant stipulations of the conveyor belt industry. 4.9 Metal Structural Parts for the Conveyors 4.9.1 The material of the metal structural parts for the conveyors shall be selected with mechanical properties not lower than Q235A in GB/T 700. 4.9.2 Ladders, railings and walking platforms shall comply with the stipulations of GB/T 4053 and GB 14784. 4.9.3 The welding grooves of the metal structural parts shall comply with the stipulations of GB/T 985.1 and GB/T 985.2.The welds shall be free from defects, such as. burn-through, cracks and lac of fusion, etc. 4.9.4 The two corresponding planes, on which, the bearing seats are installed on the conveyor head and tailstock shall be on the same plane; the flatness, the deviation of the corresponding hole pitch on both sides of the bearing seat and the difference between the diagonal lengths shall comply with the stipulations of Table 16. 4.9.5 The installation flatness of the horizontal idler shaft mounting hole axis of the idler bracket and the base of the idler bracket shall not be greater than Level-10 accuracy of GB/T 1184. 4.9.6 The straightness of the middle frame of the conveyors is 1/1,000 of that of a single group of middle frames, and the maximum shall not exceed 5 mm. 4.9.7 The outer surface of the conveyors’ hopper and guide chute, and other casings shall be flat, and there shall be no obvious hammer marks or scars. 4.10 Safety Protection Device 4.11 Surface Coating 4.11.2 Coating quality 4.12 Assembly and Whole-machine Installation 4.12.2 The floating amplitude of the fulcrum floating drive device shall not be greater than 2.0 mm. 4.12.12 After the assembly of the take-up car, the inner and outer declination angles of the tensioning steel rope and the centerline of the pulley rope groove and the vertical line of the reel shaft shall be less than 6. 4.12.13 After the cleaner is installed, the contact length between its scraper or brush and the conveyor belt in the direction of the pulley axis shall not be less than 85%. 4.12.14 The connection joint of the conveyor belt shall be flat and straight, and the straightness on the 10 m length with the joint as the center shall not be greater than 15 mm.

5 Test Methods

5.1 Visual Inspection Visual inspection includes whether the working condition of the whole machine and all important parts satisfies the requirements, and whether the appearance quality, safety signs and plates satisfy the technical requirements. 5.2 Dynamic Rotation Resistance Test of Idler Roller 5.3.2 Test procedures The test procedures of the dustproof test of the idler roller are as follows. 5.4 Waterproof Performance Test of Idler Roller 5.4.1 Water drenching test of dustproof idler roller 5.4.1.1 Test equipment The water drenching test device of the idler roller is shown in Figure 7. 5.4.1.2 Test procedures The test procedures of the water drenching test of the idler roller are as follows. 5.4.2 Water immersion test of waterproof idler roller 5.4.2.1 Test equipment The water immersion test bench of the idler roller is shown in Figure 8. 5.4.2.2 Test procedures The test procedures of the water immersion test of the idler roller are as follows. 5.5 Axial Load Bearing Test of Idler Roller 5.6 Drop Test of Idler Roller 5.6.1 Test equipment The drop test bench of the idler roller is shown in Figure 10 and Figure 11. 5.6.2 Test procedures The test procedures of the drop test of the idler roller are as follows. 5.7 Determination of Axial Displacement of Idler Roller 5.7.1 Test equipment The test device of the axial displacement of the idler roller is shown in Figure 12. 5.7.2 Test procedures The test procedures of the axial displacement of the idler roller are as follows. 5.9 Static Equilibrium Test of Pulley Body Place the pulley body on the cutting edge and adopt the conventional method to determine the compensation mass; set it at an appropriate position of the receiving plate, until the rotational equilibrium precision of the pulley complies with G40 in GB/T 9239.1.Alternatively, in accordance with Formula (9), calculate the compensation mass P0; set it at 0.8 times the diameter of the pulley on the circumference. 5.10 Non-destructing Testing of Pulley 5.12 Determination of Belt Speed Use a speedometer to determine the surface speed of the conveyor belt. After conversion, the speed is expressed in m/s. 5.13 Determination of Conveying Capacity After the conveyor normally operates with full load, determine the actual belt speed, then, stop the conveyor. Along the operating direction of the conveyor, minus the distance travelled by the conveyor from the feeding point due to the inertial operation during the downtime, 5.14 Determination of Center Alignment Operation of Conveyor Belt After the conveyor belt normally operates for at least 2 cycles, stop it; use a steel ruler to determine the deviation of the conveyor belt and the side rollers of the idler group at any 3 sites. Meanwhile, determine the deviation distance of the conveyor belt on the head pulley and the tail pulley. 5.15 Testing of Paint Film Adhesion The measurement method for paint film adhesion shall comply with the requirements of GB/T 9286.

6 Inspection Rules

6.1 General The inspection of the conveyors is divided into exit-factory inspection and type inspection. 6.2 Exit-factory Inspection Each conveyor can only be allowed to exit the factory after passing the inspection. See Table 19 for the exit-factory inspection items. 6.3 Type Inspection 6.3.1 Under one of the following circumstances, type inspection shall be carried out. 6.3.2 The type inspection items are shown in Table 19. 6.4 Sampling Method 6.4.1 The sampling scheme of the idler roller shall comply with the general inspection level II in GB/T 2828.1; the acceptance quality limit of a single sampling scheme for normal inspection is AQL = 10. 6.4.2 From the conveyors, randomly choose 3 frames, then, in accordance with the requirements of GB/T 9286, examine the paint film adhesion.

7 Marking, Packaging and Storage

7.1 Marking 7.1.1 Each conveyor shall have a product plate fixed at a prominent position on any head frame where the drive pulley is installed, and the plate shall at least include the following contents. 7.1.2 The sizes and technical requirements of the plate shall comply with the stipulations of GB/T 13306. 7.2 Packaging 7.2.1 Basic requirements The packaging of the conveyors shall comply with the stipulations of GB/T 13384.The pictorial marking for handling of goods shall comply with the relevant stipulations of GB/T 191. 7.2.2 Packaging of parts When placing the parts of the conveyors in the box, the center of gravity shall be as centered and lower as possible. If the center of gravity is obviously high, corresponding balancing measures shall be taken. 7.2.3 Idler All idler rollers shall be packaged to prevent bumping; the brackets are allowed to be bundled and shipped naked. 7.2.4 Pulley Anti-rust and protective measures shall be taken on the shaft head of the drive pulley. Protective measures shall be taken on the surface of the pulley. When the pulleys are separately shipped, measures shall be taken to prevent the pulleys from rolling. 7.2.5 Tensioning device 7.2.6 Conveyor belt The conveyor belt shall be neatly wound on the mandrel, and the outer covering shall be tightly wrapped. 7.2.7 Accompanying documents Before exiting the factory, each conveyor shall at least include the following accompanying documents. 7.3 Storage 7.3.1 Rainproof measures shall be taken for the storage of all parts of the conveyors. When stored in the open air, the conveyors shall be packed in a well-ventilated and water-free package, and shall be protected from rust when stored for a long time. 7.3.2 The idler pulleys should be sealed for storage. All structural parts shall be stored on a covered and flat floor, so as to prevent deformation and corrosion. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 10595-2017 be delivered?

Answer: The full copy PDF of English version of GB/T 10595-2017 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 10595-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 10595-2017_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 10595-2017 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 10595-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 10595-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 10595-2017?

A step-by-step guide to download PDF of GB/T 10595-2017_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 10595-2017".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9