The tolerable limits of danger on telecommunication lines from power lines
| |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB 6830-1986
GB 6830-1986: The tolerable limits of danger on telecommunication lines from power lines---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB6830-1986
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
M 04
UDC 621.315 : 621.39
The tolerable limits of danger on telecommunication
lines from power lines
ISSUED ON: SEPTEMBER 02, 1986
IMPLEMENTED ON: OCTOBER 01, 1987
Issued by: National Bureau of Standard
The tolerable limits of danger on telecommunication
lines from power lines
1 Scope
This standard applies to the hazardous impact of all types of AC power lines,
AC electric railway contact networks, other strong electric lines on the adjacent
telecommunication lines (including telecommunication lines and cables, cable
broadcast lines, cables and broadcast audio cables) under the following status
and conditions*:
1.1 Fault status of high-voltage lines
1.1.1 The three-phase symmetrical neutral point directly grounded power line
has one-phase short-circuit grounded.
1.1.2 The three-phase symmetrical neutral point indirectly grounded power line
has two-phase short-circuit grounded simultaneously at different locations.
1.1.3 The three-phase symmetrical neutral point indirectly grounded power line
has one-phase short-circuit grounded.
1.1.4 AC electric railway contact network conductor is short-circuit grounded.
1.1.5 Other asymmetric power line conductor is short-circuit grounded.
1.2 Normal operation status of high-voltage line
1.2.1 AC electric railway contact network line operate normally.
1.2.2 Other asymmetric power lines operate normally.
1.3 Grounding current impact caused by ground short-circuit fault current of the
high-voltage system
Since the power line and the AC electric railway contact network system
generate ground potential in the area where the short-circuit fault current flows
into and out of the earth, it causes ground current impact onto the adjacent
telecommunication system (the local grounding device, the underground cable).
2 Hazardous current tolerance caused by electrical
induction
When a three-phase symmetrical neutral point indirectly grounded power line
has one-phase short-circuit grounding fault, as well as in the normal operation
status of AC electric railway contact network line and other asymmetric power
lines, if the human body touches the adjacent communication line, the tolerance
of current which is caused by the electric induction and flows through human
body is 15 mA (effective value).
3 Tolerable limits of dangerous longitudinal
electromotive force due to magnetic induction on
telecommunication open line
3.1 Fault status of high-voltage line (excluding the situation described in 1.1.2)
3.1.1 When the high-voltage line is a general power line or an AC electric
railway contact network, the tolerable limit of the longitudinal electromotive
force on the communication line is 430V (effective value, the same below).
3.1.2 When the high-voltage line is a highly reliable power line**, the tolerable
limit of the longitudinal electromotive force on the communication line is 650V.
3.1.3 Generally, when building a new high-voltage line or telecommunication
line, the main principle is to avoid the dangerous impact of the power line on
the telecommunication line. In the design process of the post-built line, the
corresponding measures are first adopted to make the dangerous longitudinal
electromotive force generated on the communication line not exceed the
tolerable limit. In the process of reviewing the design of the approaching
segment of two lines, when it is found that the induced longitudinal
electromotive force may exceed the tolerable limit, the ground voltage in the
accident state may be further calculated to ensure that it does not exceed the
tolerable limits as specified in 3.1.1 and 3.1.2 in various cases.
____________________________
* The tolerable limit of the telecommunication line for the field strength from the electrostatic field by the
power line will be established separately.
** Highly reliable power line is a power line designed and constructed in accordance with the provisions
of the Technical Specification for Power Line Design. The mechanical strength of the tower and wire
is higher than that of the general power line, whilst the failure rate is low. The fault removal time, in
most cases, shall be less than 0.2s and never exceed 0.5s.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB 6830-1986 be delivered?Answer: The full copy PDF of English version of GB 6830-1986 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB 6830-1986_English with my colleagues?Answer: Yes. The purchased PDF of GB 6830-1986_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 6830-1986 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB 6830-1986?A step-by-step guide to download PDF of GB 6830-1986_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB 6830-1986". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|