HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB 50073-2013 PDF English

US$135.00 · In stock · Download in 9 seconds
GB 50073-2013: Code for design of clean room
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB 50073: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 50073-2013English135 Add to Cart 0-9 seconds. Auto-delivery Code for design of clean room Valid
GB 50073-2001EnglishRFQ ASK 3 days Code for design of clean room Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 50073-2013
      

Similar standards

GB 50144   GB/T 50046   GB 50089   GB/T 50530   

GB 50073-2013: Code for design of clean room

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50073-2013
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB 50073-2013 Code for Design of Clean Room Issued on. JANUARY 28, 2013 Implemented on. SEPTEMBER 1, 2013 Jointly Issued by. General Administration of Quality Supervision, Inspection and Quarantine (AQSIQ); Ministry of Housing and Urban-Rural Development of the People's Republic of China. National Standard of the People's Republic of China Code for Design of Clean Room Chief Development Department. Ministry of Industry and Information Technology of the People's Republic of China Approval Department. Ministry of Housing and Urban-Rural Development of the People's Republic of China Implementation Date. September 1, 2013 China Planning Press 2013 Beijing

Foreword

Table of Contents

Foreword... 3 1 General... 6 2 Terms... 6 3 Classification of Air Cleanliness... 9 4 Overall Design... 10 4.1 Location Selection and General Layout of Clean Room... 10 4.2 Process Layout and Design Coordination... 11 4.3 Personnel and Material Cleaning... 11 4.4 Noise Control... 13 4.5 Microvibration Control... 13 5 Architecture... 14 5.1 General Requirement... 14 5.2 Fire Protection and Evacuation... 15 5.3 Interior Decoration... 16 6 Air Cleaning... 17 6.1 General Requirement... 17 6.2 Pressure Difference Control of Clean Room... 18 6.3 Air Flow Pattern and Air Supply Volume... 18 6.4 Air Cleaning Treatment... 19 6.5 Heating, Ventilation and Smoke Control... 20 6.6 Air Pipe and Accessories... 20 7 Water Supply and Drainage... 21 7.1 General Requirement... 21 7.2 Water Supply... 22 7.3 Drainage... 22 7.4 Fire Water Supply and Fire-fighting Equipment... 22 8 Industrial Pipe... 23 8.1 General Requirement... 23 8.2 Pipe Material and Valve... 24 8.3 Pipe Connection... 24 8.4 Safety Technology... 25 9 Electricity... 25 9.1 Power Distribution... 25 9.2 Illumination... 26 9.3 Communication... 27 9.4 Automatic Control... 27 9.5 Electrostatic Protection and Grounding... 27 Appendix A Performance Test and Certification of the Clean Room or Clean Zone... 29 Appendix B Examples of Fire Hazard Classification for Production Room of Clean Room... 34 Appendix C Requirements for Maintenance and Management of Design of Cleaning Air-conditioning System... 35 Explanation of Wording in This Code... 36 List of Quoted Standards... 37 Code for Design of Clean Room

1 General

1.0.1 This code is formulated with view to making the design of clean room to be technologically advanced, economic, reliable, safe and qualified as well as comply with requirements of energy conservation, labor sanitation and environmental protection. 1.0.2 This code is applicable to the design of new-built, extended and rebuilt clean room. 1.0.3 Design of clean room shall the basis of construction installation, maintenance, examination, test and safe operation. 1.0.4 In addition to this code, the design of clean room shall also comply with requirements of relevant current standards.

2 Terms

2.0.1 Clean room The room where the suspended particle concentration in the air is controlled; its construction and application shall be able to reduce the entering, production and retention of particles in the room. Other relevant parameters in the room like temperature, humidity and pressure shall be controlled according to requirements. 2.0.2 Clean zone Restricted zone where the airborne particle concentration in the air is controlled; its construction and application shall be able to reduce the entering, production and retention of particles in the space. Other relevant parameters in the space like temperature, humidity and pressure shall be controlled according to requirements. Clean zone may be open or closed type. 2.0.3 Mobile clean booth Small clean room which may be moved as a whole and may be divided into two types respectively provided with hoarding made of rigid and flexible materials. 2.0.4 Room for cleaning human body The room for cleaning human body according to certain procedure before entering into clean zone. 2.0.5 Room for cleaning material The room for cleaning material according to certain procedure before entering into clean zone. 2.0.6 Particle size The diameter of the globoid which is shown on the adopted particle size tester and equivalent to the response of the tested particle. 2.0.7 Airborne particle Solid or liquid airborne particles (with dimension of 0.1~5μm) in the air used for classification of air cleanliness which are not used to represent the physical property, chemical property, radioactivity and life feature of airborne particles. 2.0.8 Ultrafine particle Particles with equivalent diameter less than 0.1μm. 2.0.9 Microparticle Particles with equivalent diameter greater than 5μm.

3 Classification of Air Cleanliness

3.0.1 The classification of air cleanliness of airborne particles in clean room (zone) shall meet the following requirements. 3.0.2 The state (as-built, at-rest and operational) of classification of air cleanliness shall be negotiated with the Owner. 3.0.3 The air cleanliness shall be measured according to the requirements of Appendix A in this code. 3.0.4 Where the microorganism or chemical pollutant is controlled by the process requirements, the corresponding concentration limit of microorganism and chemical pollutant shall be determined for each classification of air cleanliness according to the process characteristics.

4 Overall Design

4.1 Location Selection and General Layout of Clean Room 4.1.1 The location selection of clean room shall meet the following requirements and shall be determined after economic and technical comparison. 4.1.2 For location selection of clean room with microvibration control requirements, vibration effect of current vibration source nearby shall be measured, and shall be determined after analytically comparing with permissible vibration value of precise equipment or instrument. 4.1.3 The minimum distance between fresh air inlet of clean room and the traffic artery shall be greater than 50m. 4.1.4 Circular fire lane shall be set around clean room; fire lane may also be arranged along the two long sides of the clean room. 4.1.5 Materials with good integral performance and low dust production shall be adopted for road surface around the clean room. 4.1.6 Greening shall be carried out around the clean room. lawn may be planted, and plants harmful to production shall be forbidden; the greening shall not obstruct the firefighting work. 4.2 Process Layout and Design Coordination 4.3 Personnel and Material Cleaning 4.4 Noise Control 4.5 Microvibration Control

5 Architecture

5.1 General Requirement 5.1.1 The construction plan and space layout of the clean room should be properly flexible. The large space and large span column grid should be adopted for the major structure. 5.1.2 The type selection for materials of the enclosing structure of clean room shall meet the requirements of thermal insulation, fire protection, moisture protection and dust control. 5.2 Fire Protection and Evacuation 5.2.1 The clean room shall reach Grade II fire resistance at least. 5.3 Interior Decoration 5.3.1 As for the enclosing structure and interior decoration of clean room, the material shall be equipped with good air tightness, small deformation in changed temperature and humidity as well as pollutant concentration in accordance with the specified limit of the current relevant national standards. The decoration material and sealing material shall not release materials which are harmful to the quality of the product. 5.3.2 The wall and ceiling decoration in the clean room shall meet the following requirements. 5.3.3 The ground design of the clean room shall meet the following requirements. 5.3.4 The surface of technical interlayer wall and ceiling of clean room should be flat and smooth; water-proof, moisture protection or mould resistance measures shall be taken for underground technical interlayer. 5.3.9 Light wall board shall be adopted for the wallboard and ceiling in the clean room with cleanliness classification above Grade 8. 5.3.10 The combustion performance of interior decoration material must meet the relevant requirements of the current national standard "Code for Fire Prevention in Design of Interior Decoration of Buildings" (GB 50222); the smoke density grade of the decoration material shall not be greater than 50, and the test on smoke density grade of material shall meet the relevant requirements of current national standard "Test Method for Density of Smoke from the Burning or Decomposition of Building Materials" (GB/T 8627).

6 Air Cleaning

6.1 General Requirement 6.1.1 The classification of air cleanliness in all clean rooms shall meet the clean requirements of production process on production environment. 6.1.2 The air flow pattern shall be selected according to different requirements of classification of air cleanliness. 6.2 Pressure Difference Control of Clean Room 6.2.1 Certain pressure difference must be maintained between clean room (zone) and surrounding space, and positive or negative pressure shall be determined according to process requirements. 6.3 Air Flow Pattern and Air Supply Volume 6.3.1 The design of air flow pattern shall meet the following requirements. 6.3.2 The air supply volume in clean room shall be the maximum of the following three values. 6.4 Air Cleaning Treatment 6.4.1 The selection, arrangement and installation of air filter shall meet the following requirements. 6.4.2 For cleaning air-conditioning system in a relatively large clean room, the concentrated air cleaning treatment shall be carried out for its fresh air. 6.4.3 The return air shall be reasonably applied in the design of cleaning air-conditioning system. 6.5 Heating, Ventilation and Smoke Control 6.6 Air Pipe and Accessories

7 Water Supply and Drainage

7.1 General Requirement 7.1.1 The main water supply and drainage pipe in clean room shall be laid in technical interlayer or tunnel, or can be laid underground. The pipe in clean room shall be concealed and the pipe irrelevant with this room shall not cross it. 7.1.2 Where there is potential moisture condensation on the outer surface of pipe, protection measures shall be taken. The outer surface of anti-condensing layer shall be smooth and easy to clean, and shall not pollute the clean room. 7.2 Water Supply 7.2.1 The water supply system in clean room shall be set separately and shall meet the requirements on quality, temperature, pressure and volume of water used for production, living and fire-fighting. The pipe shall be designed with margin to fit process change. 7.2.2 The purity water supply pipe with high quality requirement shall adopt circulating water supply and shall meet the following requirements. 7.3 Drainage 7.4 Fire Water Supply and Fire-fighting Equipment 7.4.1 Clean room must be equipped with fire water supply facility whose arrangement and design shall be determined according to factors such as fire risk of production, fire resistance rating and volume of building. 7.4.2 The arrangement of fire water supply and fixed fire-fighting equipment of clean room shall meet the relevant requirements current national standard "Code of Design on Building Fire Protection and Prevention" (GB 50016).

8 Industrial Pipe

8.1 General Requirement 8.1.1 The laying of industrial pipe in clean room (zone) shall meet the following requirements. 8.1.2 The design of industrial pipe in clean room (zone) shall meet relevant requirements of the current national standard "Design Code for Industrial Metallic Piping" (GB 50316). 8.1.3 The design of industrial pipe shall meet the following requirements. 8.2 Pipe Material and Valve 8.2.1 The material and valve of industrial pipe shall be selected according to the physicochemical properties and service condition of transmitted material, and shall meet the requirements of production process and handling characteristics. Finally it shall be determined after technical and economical comparison. 8.2.2 The selection of high-purity gas pipe and valve shall meet the requirements of production process and the following requirements. 8.2.3 Where the dew point of dry compressed air is lower than -70℃, stainless steel pipe with brilliant-polished inner wall shall be adopted; where the dew point is lower than -40℃, stainless steel pipe or hot dip galvanizing seamless steel pipe shall be adopted. For valve, bellows valve or ball valve shall be adopted. 8.2.4 The material of valve shall match with that of connecting pipe. 8.3 Pipe Connection 8.3.1 The connection of industrial pipe shall meet the following requirements. 8.4 Safety Technology 8.4.1 The combustible gas alarm device and accident air exhaust device shall be set on the following parts, and the alarm device shall be interlocked with corresponding accident air exhaust machine. 8.4.2 For combustible gas pipe, the following safety technical measures shall be taken. 8.4.3 The following safety technical measures shall be adopted for oxygen pipe.

9 Electricity

9.1 Power Distribution 9.1.1 The low-voltage power distribution in clean room shall be designed as 220/380V. The live conductor system shall adopt single-phase two-wire system, three-phase three-wire system and three-phase four-wire system. The system ground shall adopt TN-S or TN-C-S system. 9.1.2 The electric load grade and power supply requirement in clean room shall be determined according to relevant requirements of the current national standard "Code for Design of Electric Power Supply Systems" (GB 50052) and production process. 9.1.3 The power supply and distribution design for electric fire-fighting equipment in clean rooms shall be carried out according to relevant requirements of current national standard "Code of Design on Building Fire Protection and Prevention" (GB 50016). 9.2 Illumination 9.2.1 The illuminating source in clean rooms shall be high-efficient fluorescent lamp. If there is special requirement on process or the illuminance cannot reach the design requirement, other types of illuminating sources shall be adopted. 9.2.2 The lamp for general illumination in clean room shall be installed on ceiling in an exposed way. Where the lamp is embedded into the ceiling for concealed installation, reliable sealing measure shall be taken for installation seam. 9.2.5 The arrangement of standby illuminating in clean rooms shall meet the following requirements. 9.2.7 The illuminating fixture and electric circuit of room with explosion risk in clean room shall be designed according to relevant requirements of the current national standard "Electrical Installations Design Code for Explosive Atmospheres and Fire Hazard" (GB 50058). 9.3 Communication 9.4 Automatic Control 9.5 Electrostatic Protection and Grounding 9.5.1 The electrostatic protection measure shall be taken in clean rooms according to process and production requirements. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 50073-2013 be delivered?

Answer: The full copy PDF of English version of GB 50073-2013 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50073-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB 50073-2013_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 50073-2013 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB 50073-2013?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50073-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB 50073-2013?

A step-by-step guide to download PDF of GB 50073-2013_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50073-2013".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9