HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB 37824-2019 PDF English

US$255.00 · In stock · Download in 9 seconds
GB 37824-2019: Emission standard of air pollutants for paint, ink and adhesive industry
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 37824-2019English255 Add to Cart 0-9 seconds. Auto-delivery Emission standard of air pollutants for paint, ink and adhesive industry Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 37824-2019
      

Similar standards

GB 37822   GB 31572   GB 31570   GB 37823   

GB 37824-2019: Emission standard of air pollutants for paint, ink and adhesive industry

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB37824-2019
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 13.040.40 Z 60 Emission standard of air pollutants for paint, ink and adhesive industry Issued on: MAY 24, 2019 Implemented on: JULY 01, 2019 Issued by. Ministry of Ecology and Environment; State Administration for Market Regulation.

Table of Contents

Foreword... 3 1 Scope... 5 2 Normative references... 5 3 Terms and definitions... 7 4 Organized emission control requirements... 11 5 Requirements for control of unorganized emissions... 15 6 Requirements for monitoring pollution within the enterprise boundary and surrounding areas... 19 7 Requirements for pollutant monitoring... 20 8 Implementation and supervision... 22 Appendix A (Informative) Typical air pollutants emitted by the coating, ink and adhesive industries... 23 Appendix B (Informative) VOCs unorganized emission monitoring requirements within the factory area... 26 Emission standard of air pollutants for paint, ink and adhesive industry

1 Scope

This standard specifies the emission control requirements, monitoring and supervision management requirements for atmospheric pollutants in the paints, inks and adhesives industries. This standard applies to the management of air pollutant emissions from existing paints, inks and adhesives industrial enterprises or production facilities, as well as environmental impact assessment, environmental protection facility design, completion environmental protection acceptance, issuance of pollutant discharge permits and air pollutant emission management after commissioning of paints, inks and adhesives industrial construction projects. The production equipment for synthetic resin production and modification in paints, inks and adhesives industrial enterprises shall comply with the relevant provisions of GB 31572.

2 Normative references

This standard refers to the following documents or clauses therein. For all dated references, only the dated version applies to this standard. For all undated references, the latest version (including all amendments) applies to this standard. GB 31572 Emission standard of pollutants for synthetic resin industry GB 37822 Standard for fugitive emission of volatile organic compounds GB/T 4754-2017 Industrial classification for national economic activities GB/T 8017 Standard test method for vapor pressure of petroleum products - Reid Method GB/T 15516 Air quality - Determination of formaldehyde - Acetylacetone spectrophotometric method GB/T 16157 The determination of particulates and sampling methods of gaseous pollutants emitted from exhaust gas of stationary source HJ 38 Stationary source emission - Determination of total hydrocarbons, methane from the exhaust stack, they shall be monitored before mixing and the corresponding emission control requirements shall be implemented. If the optional monitoring location can only monitor the mixed exhaust gas, it shall be implemented according to the most stringent provisions of each emission control requirement.

5 Requirements for control of unorganized emissions

5.1 Scope and time of implementation 5.1.1 From July 1, 2019 for new facilities and from July 1, 2020 for existing facilities, unorganized emission control shall be implemented in accordance with the provisions of this standard. 5.1.2 Enterprises in key regions shall implement special control requirements for unorganized emissions; the geographical scope and time of implementation shall be determined by the ecological environment department of the State Council or the provincial people's government. 5.2 Requirements for control of unorganized emissions from VOCs material storage 5.2.1 Except for volatile organic liquid storage tanks, the control requirements for unorganized emissions from VOCs material storage in paints, inks and adhesives enterprises shall comply with the provisions of GB 37822. 5.2.2 Control requirements for volatile organic liquid storage tanks 5.2.2.1 Storage tanks for volatile organic liquids with a true vapor pressure of ≥ 76.6 kPa shall use low-pressure tanks, pressure tanks or other equivalent measures. 5.2.2.2 Storage tanks for volatile organic liquids with a true vapor pressure of ≥ 10.3 kPa but < 76.6 kPa and a storage tank volume of ≥ 30 m3 shall comply with one of the following provisions. a) Use floating roof tanks. For internal floating roof tanks, high-efficiency sealing methods such as immersion seals and mechanical shoe seals shall be used between the floating roof and the tank wall; for external floating roof tanks, double seals shall be used between the floating roof and the tank wall, meanwhile the primary seal shall use high-efficiency sealing methods such as immersion seals and mechanical shoe seals. b) Use fixed roof tanks; the exhaust gas discharged shall be collected and treated and meet the requirements of Table 1 and Table 3, or the treatment efficiency shall be not less than 80%. c) Use a gas phase balance system. d) Take other equivalent measures. 5.2.3 Special control requirements for volatile organic liquid storage tanks 5.2.3.1 Storage tanks for volatile organic liquids with a true vapor pressure of ≥ 76.6 kPa shall use low-pressure tanks, pressure tanks or other equivalent measures. 5.2.3.2 Storage tanks for volatile organic liquids with a true vapor pressure of ≥ 10.3 kPa but < 76.6 kPa and a storage tank volume of ≥ 20 m3, as well as the storage tanks for volatile organic liquids with a true vapor pressure of ≥ 0.7 kPa but < 10.3 kPa and a storage tank volume of ≥ 30 m3 shall comply with one of the following provisions. a) Use floating roof tanks. For internal floating roof tanks, high-efficiency sealing methods such as immersion seals and mechanical shoe seals shall be used between the floating roof and the tank wall; for external floating roof tanks, double seals shall be used between the floating roof and the tank wall, meanwhile the primary seal shall use high-efficiency sealing methods such as immersion seals and mechanical shoe seals. b) When using a fixed roof tank, the exhaust gas shall be collected and treated and meet the requirements of Table 2 and Table 3, or the treatment efficiency shall be not less than 90%. c) Use a gas phase balance system. d) Take other equivalent measures. 5.2.4 Operation and maintenance requirements for volatile organic liquid storage tanks 5.2.4.1 Floating roof tank a) The tank body of the floating roof tank shall be kept intact and shall not have holes or gaps. The edge seal of the floating roof shall not be damaged. b) The openings (holes) of the tank accessories shall be closed, except for sampling, metering, routine inspection, maintenance and other normal activities. c) When the tank accessories such as pillars and guide devices pass through the floating roof, sealing measures shall be taken. d) Except for the emptying operation of the tank, the floating roof shall always float on the surface of the stored material. e) The automatic vent valve shall be closed and well-sealed when the floating roof is in a floating state; it only opens when the floating roof is in a supported state. f) The edge breathing valve shall be well sealed when the floating roof is in a floating state; the set pressure shall be checked regularly to see if it meets the set requirements. g) Except for the automatic vent valve and edge breathing valve, the outer edge plate of the floating roof and all the opening pipes through the floating roof shall be immersed below the liquid surface. 5.2.4.2 Fixed roof tank a) The tank body of the fixed roof tank shall be kept intact and shall not have holes or gaps. b) The openings (holes) of the storage tank accessories shall be sealed, except for sampling, measurement, routine inspection, maintenance and other normal activities. c) Regularly check whether the set pressure of the breathing valve meets the set requirements. 5.2.4.3 Maintenance and records If the volatile organic liquid storage tank does not comply with the provisions of Article 5.2.4.1 or Article 5.2.4.2, it shall be recorded and repaired or emptied within 90 days and the storage tank shall be emptied and stopped from use. If the repair or emptying of the storage tank is delayed, the relevant plan shall be reported to the ecological environment authority for determination. 5.3 VOCs material transfer and control requirements for transporting unorganized emission The transfer and transportation of unorganized emission control requirements for VOCs material of coating, ink and adhesive enterprises shall comply with the provisions of GB 37822. 5.4 Control requirements for process VOCs unorganized emission 5.4.1 Process control requirements 5.4.1.1 VOCs material batching, addition, reaction, mixing, grinding, dispersion, coloring, dilution, filtration, drying, filling or packaging processes shall be operated with closed equipment or in a closed space; the exhaust gas shall be discharged to the exhaust gas collection and treatment system. If it is not possible to be closed, local gas collection measures shall be taken; the exhaust gas shall be discharged to the exhaust gas collection and treatment system. 5.4.1.2 When cleaning mobile cylinders and equipment parts, a closed system or operation in a closed space shall be used; the exhaust gas shall be discharged to the VOCs exhaust gas collection and treatment system. If it is not possible to be closed, local gas collection measures shall be taken; the exhaust gas shall be discharged to the VOCs exhaust gas collection and treatment system. 5.4.1.3 The vacuum system shall use a dry vacuum pump; the vacuum exhaust shall be discharged to the VOCs waste gas collection and treatment system. If a liquid ring (water ring) vacuum pump, water (water vapor) jet vacuum pump, etc. are used, the circulation trough (tank) of the working medium shall be sealed; the vacuum exhaust and the exhaust of the circulation trough (tank) shall be discharged to the VOCs waste gas collection and treatment system. 5.4.1.4 When the equipment and its pipelines carrying VOCs materials are started and stopped, inspected, repaired and cleaned, the remaining materials shall be completely returned during the material return stage and contained in a sealed container. The exhaust gas during the material return process shall be discharged to the VOCs waste gas collection and treatment system; the exhaust gas during the cleaning and purging process shall be discharged to the VOCs waste gas collection and treatment system. 5.4.1.5 VOCs-containing waste materials (slag, liquid) generated during the process shall be stored, transferred, transported in accordance with the requirements of Articles 5.2 and 5.3.Waste packaging containers that have contained VOCs materials shall be covered and sealed. 5.4.1.6 Enterprises shall establish a ledger in accordance with the requirements of HJ 944 to record the name, usage, recycling, waste, destination and VOCs content of raw and auxiliary materials containing VOCs. The ledger shall be kept for no less than 3 years. 5.4.2 Special control requirements for process In addition to complying with the provisions of Article 5.4.1, enterprises in key regions shall also meet the following requirements. a) The waste gas replaced during the feeding of the high-level trough (tank) shall be discharged to the VOCs waste gas collection and treatment system or the gas phase balance system. b) When cleaning the mobile cylinder and equipment parts, a closed system or operation in a closed space shall be used; the waste gas shall be discharged to the VOCs waste gas collection and treatment system. c) If the laboratory uses chemicals or VOCs materials containing VOCs for experiments, a fume hood (cabinet) shall be used or local gas collection shall be performed; the waste gas shall be discharged to the VOCs waste gas collection and treatment system. 5.5 Requirements for VOCs leakage control of equipment and pipeline components

7 Requirements for pollutant monitoring

7.1 General requirements 7.1.1 Enterprises shall establish enterprise monitoring systems and formulate monitoring plans in accordance with relevant laws, the "Environmental Monitoring Management Measures" and HJ 819; conduct self-monitoring of pollutant emissions and their impact on the surrounding environmental quality, preserve original monitoring records; publish monitoring results. 7.1.2 Requirements for new and existing facilities to install automatic monitoring equipment for pollutant emissions shall be implemented in accordance with relevant laws and the "Automatic Monitoring Management Measures for Pollution Sources". 7.1.3 Enterprises shall design, construct, maintain permanent sampling ports, sampling test platforms, sewage outlet signs in accordance with the requirements of environmental monitoring management provisions and technical specifications. 7.1.4 Atmospheric pollutant monitoring shall be carried out at the specified monitoring location. If there are waste gas treatment facilities, monitoring shall be carried out after the treatment facilities. Determine the pollutant items that need to be monitored based on the raw materials, production process, products, by-products, etc. used by the enterprise. 7.2 Monitoring sampling and analysis methods 7.2.1 The monitoring sampling of atmospheric pollutants in the exhaust pipe shall be carried out in accordance with the provisions of GB/T 16157, HJ/T 397, HJ 732.For pollution sources with periodic fluctuations in emission intensity such as breathing exhaust from storage tanks, the pollutant emission monitoring period shall cover the period with high emission intensity. 7.2.2 The monitoring sampling of atmospheric pollutants at the enterprise boundary shall be carried out in accordance with the provisions of HJ/T 55. 7.2.3 The analysis and determination of atmospheric pollutants shall adopt the method standards listed in Table 5. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 37824-2019 be delivered?

Answer: The full copy PDF of English version of GB 37824-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 37824-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB 37824-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 37824-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB 37824-2019?

A step-by-step guide to download PDF of GB 37824-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 37824-2019".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9