HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

FZ/T 54025-2009 PDF English

US$160.00 · In stock · Download in 9 seconds
FZ/T 54025-2009: Polyamide 66 pre-oriented yarn
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
FZ/T 54025-2009English160 Add to Cart 0-9 seconds. Auto-delivery Polyamide 66 pre-oriented yarn Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: FZ/T 54025-2009
      

Similar standards

FZ/T 51013   GB/T 14189   FZ/T 51023   

FZ/T 54025-2009: Polyamide 66 pre-oriented yarn

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/FZT54025-2009
FZ TEXTILE INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 59.060 W 51 Polyamide 66 pre-oriented yarn 锦纶 66预取向丝 Issued on: JANUARY 20, 2010 Implemented on: JUNE 01, 2010 Issued by. Ministry of Industry and Information Technology of PRC

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative references... 4 3 Terms and definitions... 5 4 Product classification and marking... 5 5 Requirements... 5 6 Test methods... 6 7 Inspection rules... 7 8 Signs... 10 9 Packaging, transportation, storage... 10 Appendix A (Informative) Appearance requirements, inspection, evaluation... 11 Appendix B (Informative) Recommended method for rapid humidity conditioning of specimens... 13 Polyamide 66 pre-oriented yarn

1 Scope

This standard specifies the product classification and identification, technical requirements, test methods, inspection rules and marking, packaging, transportation, storage requirements of polyamide 66 pre-oriented yarn. This standard is applicable to the quality identification, acceptance, arbitration of pre- oriented yarns (mainly used for processing elastic yarns) made of polyhexamethylene adipamide as raw materials, as well as glossy, semi-matte and full-matte yarns which have a nominal linear density range of 8 dtex ~ 167 dtex, a single yarn linear density of 1.0 dtex ~ 5.5 dtex, a circular cross-sectional shape.

2 Normative references

The clauses in the following documents become the clauses of this standard through reference in this standard. For all referenced documents with dates, all subsequent amendments (excluding errata) or revisions are not applicable to this standard. However, parties reaching an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. For all referenced documents without dates, the latest versions are applicable to this standard. GB/T 2828.1-2003 Sampling procedures - Part 1.retrieval by acceptance quality limit (AQL) for lot-by-lot inspection sampling plan GB/T 3291.1 Textiles - Terms of textile material properties and test - Part 1.Fiber and yarn GB/T 3291.3 Textiles - Terms of textile material properties and test - Part 3.General GB/T 4146.1 Textiles - Man-made fibres - Part 1.Generic names GB/T 6502 Sampling method of man-made filament yarns GB/T 6503 Testing method for moisture regain of man-made fibres GB/T 6504 Testing method for oil content of man-made fibres GB/T 6529 Textiles - Standard atmospheres for conditioning and testing GB/T 8170 Rules of rounding off for numerical values and expression and judgement of limiting values 6.1.1.2.2 Test - Temperature (20 ± 2) °C; - Relative humidity (65 ± 2)%. 6.1.1.2.3 Others Others shall be carried out in accordance with the provisions of GB/T 6529. 6.1.2 Sampling and specimen preparation According to GB/T 6502, 20 laboratory samples are obtained and humidified under the conditions specified in 6.1.1.2.If the supplier and the purchaser have an agreement, the humidity can be adjusted according to the rapid humidity adjustment method in Appendix B. Specimens exceeding the specified moisture regain need to be pre- humidified. 6.2 Linear density test It is performed according to GB/T 14343. 6.3 Tensile property test It is performed according to GB/T 14344. 6.4 Yarn uniformity test It is performed according to GB/T 14346. 6.5 Oil content test It is performed according to GB/T 6504. 6.6 Appearance inspection Refer to Appendix A or it is performed according to the agreement between the supplier and the purchaser. 6.7 Numerical rounding The data of the test results shall be processed according to the provisions of GB/T 8170; the decimal places shall be rounded as shown in Table 1.

7 Inspection rules

7.1 Exit-factory inspection 7.1.1 Inspection items 7.1.1.1 Appearance inspection items refer to Appendix A or are inspected according to the requirements of both parties. 7.1.1.2 Physical performance items in Table 1 are all assessment items and are inspected according to the test methods specified in Chapter 6. 7.1.2 Group-batching rules Periodic sampling is used to form inspection lots within a certain range. A production lot can be composed of one inspection lot or several inspection lots. 7.1.3 Sampling requirements 7.1.3.1 All appearance items are inspected. The appearance and barrel weight of the laboratory samples taken shall meet the corresponding grades. 7.1.3.2 Laboratory samples of physical performance items are taken for inspection according to GB/T 6502. 7.1.4 Comprehensive evaluation 7.1.4.1 Appearance inspection items are evaluated barrel by barrel, according to the requirements specified in Appendix A or the requirements of the supplier and purchaser. 7.1.4.2 The calculated values of each physical performance test item are compared with the limit values of the performance item indicators in Table 1, according to the rounding value comparison method in GB/T 8170, to evaluate the grade of each item. 7.1.4.3 The lowest grade of the physical performance items and appearance items in the inspection lot is finally determined as the grade of the batch of products. 7.2 Re-inspection rules Within three months after a batch of products arrives at the consignee, it can be used for acceptance or re-submitted for reinspection where there is an objection to the quality. If more than one-third of the batch of products are used, re-inspection shall not be applied. If the quality of the batch of products affects the quality of the post-processing products and causes serious losses, the supplier and the purchaser shall analyze the reasons, clarify the responsibilities, negotiate to deal with it. Damaged packages shall not be sampled. 7.2.1 Inspection items Same as 7.1.1. 7.2.2 Group-batching requirements

8 Signs

8.1 The product name, specification, grade as required by Chapter 4 shall be marked in eye-catching colors on both sides of the packaging box. 8.2 The identification mark of the producer includes the name of the manufacturer, batch number, net weight or gross weight, number of rolls inside, production date, implemented standard number, detailed address. 8.3 The sign of the general distributor includes the product name, trademark, identification mark, detailed address, etc. 8.4 The sign shall indicate requirements such as avoiding moisture and handle with care.

9 Packaging, transportation, storage

9.1 Packaging 9.1.1 Each roll shall have a protective layer and shall be protected from damage in the packaging box. 9.1.2 The size of the rolls in each packaging box shall be as uniform as possible. Different varieties, specifications, batch numbers, grades shall be packed separately. 9.1.3 Each batch of products shall be accompanied by a quality inspection sheet. 9.2 Transportation A canopy is required during transportation. During transportation, the packaging box shall be protected from damage and the items shall not be exposed to moisture. 9.3 Storage The packaging boxes are stacked in batches and stored in a dry, clean, ventilated warehouse. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of FZ/T 54025-2009 be delivered?

Answer: The full copy PDF of English version of FZ/T 54025-2009 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of FZ/T 54025-2009_English with my colleagues?

Answer: Yes. The purchased PDF of FZ/T 54025-2009_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- FZ/T 54025-2009 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of FZ/T 54025-2009?

A step-by-step guide to download PDF of FZ/T 54025-2009_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "FZ/T 54025-2009".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9